The German-made SpiderPlow is engineered and manufactured to exacting standards that have been refined over the last 30 years. We are the exclusive North American distributor.

Videos

Select a thumbnail below to view the videos (Quicktime player required):

Dropping the ripper and chute into the ground

Plowing in flexible 6" pipe

SpiderPlow is pulled forward by the Winch Crawler

Pulling in 6" pipe

Unique design minimizes ground disturbance

- 22 secs
- 1.5mb

- 20 secs
- 1.1mb

- 27 secs
- 1.8mb

- 22 secs
- 1.6mb

- 25 secs
- 1.6mb

 

Load cell pulling in pipe

Minimal reclamation required

Pulling a pipe

Minimal impact

Each leg operates independently

- 45 secs
- 3.1mb

- 16 secs
- 1.3mb

- 1.44 mins
- 7.9mb

- 5 secs
- 0.6mb

- 42 secs
- 2.9mb

 

The Winch Crawler anchors in the ground

Plows in steep terrain

Winch Crawler pulling Plow down a hill - note minimal ground disturbance

Pulling multiple lines across a river bed

Coming out of the river bed with multiple lines

- 11 secs
- 0.7mb

- 12 secs
- 1.5mb

- 52 secs
- 4.5mb

- 2 mins
- 9.3mb

- 32 secs
- 2.3mb

 

Fast and easy installation

- 11 secs
- 0.7mb

 

 

 

 

Photographs

Select a thumbnail below to open a larger version (800x600):

Challenging Terrain

Plowing in multiple lines Minimal ground disturbance pulling in 4" steel Navigating a steep slope Easily works around obstacles Adapts to various terrain

 

Wet plowing Fiber optic conduit plowed in for Americom Technology Inc. in Utah Installing 200 meters of pipe beneath 2 meters of riverbed silt and cobble Plowing around corners Plowing in 4-inch rigid steel pipe over hills

SpiderPlow Completed Projects

12" flexible pipe Adaptable in adverse climate conditions 8" pipe Can plow to a depth of over 2.0 meters Plowing in Fiberspar

 

Plowing in Fiberspar 4" pipe installed in one day for Husky Energy Four lines of Fiberspar flexible composite pipe plowed in for EnCana Fiber optic conduit plowed in for Americom Technology Inc. in Utah 20,000 feet of Flexsteel installed in 2 days

 

20,000 feet of Flexsteel installed in 2 days including site reclamation FlexPipe plowed in the Powder River Basin, Wyoming 21 miles of FlexPipe composite installed for Samson Resources Company In under 2 days, 8 miles of leaky water lines were replaced Installing 3" HDPE pipe for CerPro Energy Services in Saskatchewan

 

Installing 3" HDPE pipe under the South Saskatchewan river Installing 3" HDPE pipe under the South Saskatchewan river First rigid steel pipe plowing project for Anderson Energy Ltd. and Carco Pipelines Plowing 4-inch rigid steel pipe in the rimbey area of Alberta 4-inch rigid steel pipe successfully plowed in perfect condition

 

Plowing 26 miles of conduit pipe immediately beside highway guardrail in Massachusetts Plowing 2.5 meters of cover Geothermal Exchange project for Walmart and Stantec

 

Details

SpiderPlow FSP 200 Rubber tracks on the Winch Crawler Anchor Patented chute design Patented ripper toe

 

Rubber track and tires Dedicated transport Anchor & winch

FSP 200

FSP 220

Winch Crawler