Videos
Select a thumbnail below to view the videos (Quicktime player required):
Dropping the ripper and chute into the ground |
Plowing in flexible 6" pipe |
SpiderPlow is pulled forward by the Winch Crawler |
Pulling in 6" pipe |
Unique design minimizes ground disturbance |
- 22 secs
- 1.5mb |
- 20 secs
- 1.1mb |
- 27 secs
- 1.8mb |
- 22 secs
- 1.6mb |
- 25 secs
- 1.6mb |
Load cell pulling in pipe |
Minimal reclamation required |
Pulling a pipe |
Minimal impact |
Each leg operates independently |
- 45 secs
- 3.1mb |
- 16 secs
- 1.3mb |
- 1.44 mins
- 7.9mb |
- 5 secs
- 0.6mb |
- 42 secs
- 2.9mb |
The Winch Crawler anchors in the ground |
Plows in steep terrain |
Winch Crawler pulling Plow down a hill - note minimal ground disturbance |
Pulling multiple lines across a river bed |
Coming out of the river bed with multiple lines |
- 11 secs
-
0.7mb |
- 12 secs
- 1.5mb |
- 52 secs
- 4.5mb |
- 2 mins
- 9.3mb |
- 32 secs
- 2.3mb |
Fast and easy installation |

|

|

|

|
- 11 secs
- 0.7mb |
|
|
|
|
Photographs
Select a thumbnail below to open a larger version (800x600):
Challenging Terrain
 |
 |
 |
 |
 |
| Plowing in multiple lines |
Minimal ground disturbance pulling in 4" steel |
Navigating a steep slope |
Easily works around obstacles |
Adapts to various terrain |
 |
 |
 |
 |
 |
| Wet plowing |
Fiber optic conduit plowed in for Americom Technology Inc. in Utah |
Installing 200 meters of pipe beneath 2 meters of riverbed silt and cobble |
Plowing around corners |
Plowing in 4-inch rigid steel pipe over hills |
SpiderPlow Completed Projects
 |
 |
 |
 |
 |
| 12" flexible pipe |
Adaptable in adverse climate conditions |
8" pipe |
Can plow to a depth of over 2.0 meters |
Plowing in Fiberspar |
 |
 |
 |
 |
 |
| Plowing in Fiberspar |
4" pipe installed in one day for Husky Energy |
Four lines of Fiberspar flexible composite pipe plowed in for EnCana |
Fiber optic conduit plowed in for Americom Technology Inc. in Utah |
20,000 feet of Flexsteel installed in 2 days |
 |
 |
 |
 |
 |
| 20,000 feet of Flexsteel installed in 2 days
including site reclamation |
FlexPipe plowed in the Powder River Basin,
Wyoming |
21 miles of FlexPipe composite installed for
Samson Resources Company |
In under 2 days, 8 miles of leaky water lines were replaced |
Installing 3" HDPE pipe for CerPro Energy Services in Saskatchewan |
 |
 |
 |
 |
 |
| Installing 3" HDPE pipe under the South Saskatchewan river |
Installing 3" HDPE pipe under the South Saskatchewan river |
First rigid steel pipe plowing project for Anderson Energy Ltd. and Carco Pipelines |
Plowing 4-inch rigid steel pipe in the rimbey area of Alberta |
4-inch rigid steel pipe successfully plowed in perfect condition |
 |
 |
 |
| Plowing 26 miles of conduit pipe immediately beside highway guardrail in Massachusetts |
Plowing 2.5 meters of cover |
Geothermal Exchange project for Walmart and Stantec |
Details
 |
 |
 |
 |
 |
| SpiderPlow FSP 200 |
Rubber tracks on the Winch Crawler |
Anchor |
Patented chute design |
Patented ripper toe |
 |
 |
 |
| Rubber track and tires |
Dedicated transport |
Anchor & winch |
FSP 200
FSP 220
Winch Crawler
