The German-made SpiderPlow is engineered and manufactured to exacting standards that have been refined over the last 30 years. We are the exclusive North American distributor.

Videos

Javascript is required to view the videos. Please turn it on from your browser preferences

 

Select a thumbnail below to view the videos:

Dropping the ripper and chute into the ground

Plowing in flexible 6" pipe

SpiderPlow is pulled forward by the Winch Crawler

Pulling in 6" steel

Unique design minimizes ground disturbance

- 22 secs
- 1.5mb

- 20 secs
- 1.1mb

- 27 secs
- 1.8mb

- 22 secs
- 1.6mb

- 25 secs
- 1.6mb

 

Load cell pulling in pipe

Minimal reclamation required

Pulling a pipe

Minimal impact

Each leg operates independently

- 51 secs
- 3.5mb

- 16 secs
- 1.3mb

- 1.44 mins
- 7.9mb

- 5 secs
- 0.6mb

- 42 secs
- 2.9mb

 

The Winch Crawler anchors in the ground

Plows in steep terrain

Winch Crawler pulling Plow down a hill - note minimal ground disturbance

Pulling multiple lines across a river bed

Coming out of the river bed with multiple lines

- 11 secs
- 0.7mb

- 12 secs
- 1.5mb

- 52 secs
- 4.5mb

- 2 mins
- 9.3mb

- 32 secs
- 2.3mb

 

Fast and easy installation

- 11 secs
- 0.7mb

 

 

 

 

Photographs

Select a thumbnail below to open a larger version (800x600):

FSP 200

Winch Crawler

Operations

Plowing in 4" pipe Plowing in multiple lines Minimal ground disturbance pulling in 4" steel Navigating a steep slope Easily works around obstacles

Details

SpiderPlow FSP 200 Rubber tracks on the Winch Crawler Anchor Patented chute design Patented ripper toe

Other

12" flexible pipe Adaptable in adverse climate conditions 8" pipe Rubber track and tires Dedicated transport

 

Anchor & winch Adapts to various terrain Can plow to a depth of ove 2.0 meters Plowing in Fiberspar Plowing around corners

 

Wet plowing Plowing in Fiberspar 4" pipe installed in one day for Husky Energy Four lines of Fiberspar flexible composite pipe plowed in for EnCana Fiber optic conduit plowed in for Americom Technology Inc. in Utah

 

Fiber optic conduit plowed in for Americom Technology Inc. in Utah 20,000 feet of Flaxsteel installed in 2 days 20,000 feet of Flaxsteel installed in 2 days including site reclamation