Videos
Javascript is required to view the videos. Please turn it on from your browser preferences
Select a thumbnail below to view the videos:
Dropping the ripper and chute into the ground
Plowing in flexible 6" pipe
SpiderPlow is pulled forward by the Winch Crawler
Pulling in 6" steel
Unique design minimizes ground disturbance
- 22 secs
- 1.5mb
- 20 secs
- 1.1mb
- 27 secs
- 1.8mb
- 22 secs
- 1.6mb
- 25 secs
- 1.6mb
Load cell pulling in pipe
Minimal reclamation required
Pulling a pipe
Minimal impact
Each leg operates independently
- 51 secs
- 3.5mb
- 16 secs
- 1.3mb
- 1.44 mins
- 7.9mb
- 5 secs
- 0.6mb
- 42 secs
- 2.9mb
The Winch Crawler anchors in the ground
Plows in steep terrain
Winch Crawler pulling Plow down a hill - note minimal ground disturbance
Pulling multiple lines across a river bed
Coming out of the river bed with multiple lines
- 11 secs
-
0.7mb
- 12 secs
- 1.5mb
- 52 secs
- 4.5mb
- 2 mins
- 9.3mb
- 32 secs
- 2.3mb
Fast and easy installation
- 11 secs
- 0.7mb
Photographs
Select a thumbnail below to open a larger version (800x600):
FSP 200
Winch Crawler
Operations
Plowing in 4" pipe
Plowing in multiple lines
Minimal ground disturbance pulling in 4" steel
Navigating a steep slope
Easily works around obstacles
Details
SpiderPlow FSP 200
Rubber tracks on the Winch Crawler
Anchor
Patented chute design
Patented ripper toe
Other
12" flexible pipe
Adaptable in adverse climate conditions
8" pipe
Rubber track and tires
Dedicated transport
Anchor & winch
Adapts to various terrain
Can plow to a depth of ove 2.0 meters
Plowing in Fiberspar
Plowing around corners
Wet plowing
Plowing in Fiberspar
4" pipe installed in one day for Husky Energy
Four lines of Fiberspar flexible composite pipe plowed in for EnCana
Fiber optic conduit plowed in for Americom Technology Inc. in Utah
Fiber optic conduit plowed in for Americom Technology Inc. in Utah
20,000 feet of Flaxsteel installed in 2 days
20,000 feet of Flaxsteel installed in 2 days including site reclamation